Location: Ardahan
-
Operating Company: Ünal Group of Companies
-
License Number: EU / 1508-1 / 1093
-
Installed Power: 125.15 MWe
-
Installed Power Ratio: 0.1538%
-
Production Capacity: 302.32 GWh-year
-
Annual Electricity Generation: ~ 185 GWh
Köroğlu Dam and Kotanlı HEPP are located on the Kura River of Ardahan.
Ünal Group of Companies is a subsidiary of EBD Enerji Üretim ve Tic. Inc. Turkey's 119-run power plants with an installed capacity of 125.15 MW by.
Ardahan is the largest power plant.
The resort is also Turkey's 41 largest Hydroelectric Power Plant. Köroğlu Dam and Kotanlı HEPP can meet all the electrical energy needs of 55.746 people in daily life (housing, industry, subway transportation, public apartment, environmental lighting) with an average of 184,520,040 kilowatt-hours of electricity production.
Köroğlu Dam and Kotanlı HEPP produce electricity that can meet the electricity needs of 58,578 houses only when the electricity consumption is considered.